Casa Mesa Substation

Client: Blattner Energy

Location: House, NM

Completion: June 2018 – November 2018

Scope/Description:

  • Retro fit to the existing 34.5 to 345kV substation to receive new wind farm circuits
  • Equipment installed included control building, switches, cap banks, MODs, CT/PT Combos, and over 150 batteries